How soon can BC Solar install an off-grid system?
How Soon Can BC Solar Install an Off-Grid Solar System?
Thinking about going off-grid? That’s a smart move—especially here in Ohio, where energy independence can mean peace of mind during outages and rising utility costs. One of the first questions we hear at BC Solar is:
“How soon can you install my off-grid solar system?”
Let’s break it down.
Project Timeline: 4 to 10 Weeks
We typically complete off-grid solar installations within 4 to 10 weeks of your consultation. The actual timeline depends on:
System complexity — Batteries? Backup generator? Critical loads panel?
Permit and utility approval — Some counties move faster than others.
Product availability — We won’t compromise by installing rushed or mismatched gear.
Why We Take Our Time
At BC Solar, we don’t believe in shortcuts.
You’re trusting us with your energy future, and that means doing the job right the first time. Every system is custom-engineered. We evaluate your usage, storage needs, property layout, and future goals to make sure the setup fits—and lasts.
We’ve had customers thank us years later for the way their systems still perform. That’s the BC Solar difference.
What Happens During the 4–10 Weeks?
Here’s what you can expect after your consultation:
Site Visit & Load Analysis
We review your energy needs and location.System Design
Custom-engineered for your lifestyle, not copied from someone else’s roof.Permitting & Paperwork
We handle the filings so you don’t have to.Equipment Ordering
We source high-quality batteries, inverters, and solar panels (often Sol-Ark and lithium batteries like EG4 or HomeGrid).Installation
Our local team gets the job done with craftsmanship and care.Testing & Walkthrough
We’ll make sure everything works—whether the grid is up or down.
FAQs About Off-Grid Solar Installations
How much does an off-grid solar system cost in Columbus?
Costs vary depending on your energy usage and system design. Most residential setups range from $25,000 to $60,000, including battery backup. We’ll give you transparent pricing before anything starts.
Do I need permits for an off-grid system in Ohio?
Yes. Even off-grid systems require local electrical and sometimes structural permits. We handle the entire process, from submission to inspection.
Can I add batteries to my solar system later?
Yes—but if you know you’ll want energy storage, it’s best to design around it from the start. BC Solar specializes in battery-first design, not bolt-on afterthoughts.
Why BC Solar?
Owned and operated by Brian Zaayer, BC Solar is based right here in Columbus. We’re not a franchise, and we don’t outsource your install. We treat every home like it’s our own—and we’re proud to say much of our business comes from referrals and repeat clients.
📍 Visit us at 777 Busch Ct, Columbus, OH 43229
📞 Call us at (614) 442-9700