How long does the installation process typically take?
How Long Does Commercial Solar Panel Installation Take?
If you're considering solar for your business, one of the first questions you’ll ask is:
How long does the commercial solar installation process take?
At BC Solar, we understand that time is money. You need a clear, honest picture of the timeline — not sales fluff.
Here’s what to expect:
Typical Timeline: 2 to 6 Months
Every commercial solar project is unique. But in most cases, from the first meeting to final system activation, you're looking at 2 to 6 months.
Here’s how that breaks down:
Step-by-Step Breakdown
1. Site Assessment + Consultation (1–2 weeks)
We visit your facility, look at your electric usage, roof or land space, and goals. This is a conversation, not a sales pitch.
2. System Design + Proposal (1–2 weeks)
We create a custom design — including solar, batteries (if needed), and ROI estimates. You’ll get a transparent proposal that makes sense for your business.
3. Permitting + Utility Approval (4–8 weeks)
This is the part most people underestimate. In Ohio, permitting and utility interconnection can take over a month. We handle all of it — no chasing inspectors or paperwork on your end.
4. Installation (2–4 weeks)
We schedule work around your business hours to reduce disruption. A small to medium system may take 2 weeks. Larger systems or roof work can push closer to 4.
5. Final Inspections + Activation (1–2 weeks)
Once installed, we coordinate final city inspections and utility sign-off. Then your system goes live.
Why BC Solar Projects Stay on Track
We handle everything in-house. No subcontractor confusion or finger-pointing.
We know the Columbus permitting process. We’ve done this before — and we’ll do it right.
We plan around your operations. Whether you’re running a warehouse or a church, we minimize downtime.
We stay in communication. You’ll always know where things stand.
FAQ
How soon can we start the process?
If you're ready, we can usually begin the consultation and site visit within 1–2 weeks.
What causes the biggest delays?
Delays usually come from permitting or utility interconnection — not installation. That’s why we front-load this process and start paperwork early.
Can we install during winter?
Yes. We work year-round in Central Ohio. Snow or cold may cause brief delays, but they rarely affect the overall timeline.
Do we need to shut down operations?
Not usually. We schedule work during off-hours or in phases to keep your business running.
At BC Solar, we don’t cut corners — and we don’t leave you guessing. From planning to final switch-on, we do the right thing, because it’s the right thing.
📍 Serving Columbus and surrounding communities with integrity and craftsmanship.
Need a custom estimate or timeline for your business?
Call Brian Zaayer directly at (614) 442-9700 or contact us online.