Wondering how long it takes to install a solar carport or ground mount system? Get the real timeline for permitting, construction, and inspections in Columbus from BC Solar.

How long does a carport install take?

January 11, 20262 min read

How Long Does a Solar Carport Installation Take?

If you're considering a solar carport or ground mount system in Columbus, you're likely asking:
"How long will this whole process take?"
Let’s break it down honestly — no fluff, no guesswork.

Overall Timeline: 4–8 Weeks

Most solar carport and ground mount installations take between 4 to 8 weeks from start to finish. Here's why:

Phase 1: Planning, Permitting & Engineering (3–6 Weeks)

Before anything gets installed, there’s behind-the-scenes work:

  • Site evaluation and system design

  • Structural engineering

  • Local permitting

  • Utility coordination

  • HOA or zoning approvals (if needed)

We handle all of this for you — seamlessly. But timelines depend on your jurisdiction and utility response times.

Phase 2: Physical Installation (3–5 Days)

The actual build is the fastest part:

  • Foundations are poured or driven.

  • Steel structures go up.

  • Panels and wiring are installed.

  • System is inspected and energized.

For residential carports or smaller ground mounts, most installs take about 3 days. Larger commercial or multi-array systems may need up to 5 business days.


Why Does It Vary?

Here are a few things that can affect your timeline:

  • Soil conditions (especially for ground mounts)

  • Weather delays (Ohio winters can cause setbacks)

  • Permit turnaround times (varies by city or county)

  • Utility interconnection delays

At BC Solar, we don’t just “install solar” — we manage the entire process from Day 1.

We stay in touch with clear updates, and we never leave you guessing.


Real Customers Say It Best

“BC Solar coordinated everything — permits, inspections, you name it. All I had to do was say yes. The carport install was fast and clean.”
Megan C., Columbus homeowner


FAQ: Solar Carport & Ground Mount Installations

How long does a carport install take start to finish?
Typically 4–8 weeks. The physical installation is only 3–5 days; the rest is permitting and coordination.

Can I drive under the carport during install?
We’ll ask you to park elsewhere during install days. Once complete, the structure is 100% usable.

Is the process different from rooftop solar?
Yes. Ground and carport systems involve structural components and often require additional engineering.

What if I already have solar and want to add a carport?
No problem — we can integrate your system or expand it using your existing inverter if it's compatible.


Interested in adding a solar carport or ground mount system in Columbus?

Give us a call at (614) 442-9700 or start the conversation at bc.solar.