Commercial Solar Installation Timeline: From Quote to Completion
Commercial Solar Installation Timeline: From Quote to Completion
Switching to solar is a smart move for businesses in Columbus, Ohio—but it helps to know what to expect before starting. At BC Solar, we believe in full transparency. Whether you're powering a warehouse, office building, or bank, here’s how a commercial solar project flows from start to finish—and how long each step typically takes.
Step 1: Site Evaluation & Quote (1–2 Weeks)
We begin with a custom assessment. This includes:
Reviewing your past electric bills
Checking your building’s roof or land space
Discussing goals like reducing costs or ensuring backup power
Within days, you’ll receive a detailed proposal—complete with design options, estimated savings, and clear costs. No pressure. Just facts.
Step 2: Permitting & Interconnection Paperwork (2–4 Weeks)
Once you green-light the project, we prepare and submit:
Structural/electrical plans for city permitting
Interconnection applications with your utility
This step often takes the most time, especially in busy permitting seasons. We stay on top of every detail so you're not stuck in limbo.
Step 3: Equipment Procurement & Scheduling (1–3 Weeks)
While waiting on permits, we secure the right materials for your system:
Panels, racking, and inverters
Battery systems if included
Coordination with suppliers to avoid delays
Because we don’t use a cookie-cutter approach, we only order what your system actually needs—no upsells, no waste.
Step 4: Installation (5–10 Business Days)
We work quickly and cleanly to minimize disruption. Most mid-size commercial systems (50–250 kW) are installed in under two weeks. Larger systems may take more time, especially if structural upgrades are needed.
Our trained crew handles:
Secure roof mounting or ground mounting
Wiring and inverter integration
Battery setup if applicable
Step 5: Inspections & Utility Approval (1–3 Weeks)
Once installed, we schedule:
Final inspection with local building officials
Utility approval to turn on the system (net metering setup)
We coordinate all of this—keeping you informed but stress-free.
Step 6: System Commissioning & Training (1 Day)
You’re live!
We walk you through:
System performance monitoring
Troubleshooting basics
What to expect month-to-month
Your system is now producing clean, reliable energy for your business—and likely saving you thousands in annual electricity costs.
Commercial Installation Timeline Overview
Phase Time Estimate Site Visit & Proposal 1–2 weeks Permitting & Interconnection 2–4 weeks Equipment Procurement 1–3 weeks Installation 1–2 weeks Inspection & Utility Setup 1–3 weeks Total Project Time 6–12 weeks
Why Businesses Choose BC Solar
We’re not just solar installers—we’re energy problem solvers. With BC Solar, you get:
Battery-first designs to reduce demand charges
Honest timelines and upfront costs
Local accountability with owner Brian Zaayer overseeing every job
Need to reduce peak utility costs or protect against outages? We can even install battery systems without solar to cut peak demand charges.
Let’s map out your project together.